
Integrated Safety Management TSP Operational Readiness Review TSP © 2000, 2001, 2002 , 2003 Organizational Analysis Corporation, All rights reserved.The Theory of Missions™ is a registered trademark of Organizational Analysis Corporation.
|
|
![]() The Beach © 2000 Suzanne Bradley |
In each TSP, OAC uses a powerful combination of expertise and next generation mission assessment and design technology to produce your desired outcome. We focus on opportunities that characterize the most compelling vision of your future business. Your vision serves as the foundation of our efforts. With that vision articulated, we engage in a process designed to produce that vision as a reality either through supporting your staff in completing critical projects or providing a timely injection of skills and expertise. These tasks include the capture of an expanding technology segment, start-up or restart of new production facilities, or specialized adaptation of technology not available in your industry.
OAC uses methodologies founded in The Theory of Missions™ and applied through technical venues where the use of intent to convert concepts to physical reality in a cost-effective manner can most effectively be realized.
Service areas include:
![]()
Any organization that is committed to continuous improvement in its performance must have a lessons learned program as a principal component in its management programs.
![]()
Occurrences that may appear minor on the surface can often be harbingers of much deeper causal factors that management needs to identify and resolve in an expeditions manner.
Technical Service Packages include:
![]()
![]()
A properly
designed and configured integrated safety management system is designed to
achieve operational effectiveness through the integration of environmental
compliance, quality assurance, risk assessment and mitigation, and safety
and health protection procedures; incorporated by design into work
planning and implementation of those plans.
![]()
![]()
An Operational Readiness Review (ORR) should be performed anytime a new facility is started up or an existing facility is restarted after an extend shutdown for modifications, repairs, or other reasons.
Return to hyperlink list of Products and Services